Single Head Seamless Welding Machinery of UPVC Window Door
Feature of upvc window machine
- Used for welding colorful profiles
- Will clean slag after finish welding at same time
- Equipped with automatic blowing system ,can improve work efficiency ,and remove welding slag quickly.
- PLC control machinery working.
- Pneumatic drive, simple operation, stable capability.
- Co-extrusion tool adopts aluminum alloy material, precisely proceed with high-frequency queching
- Technical Specifications
|
220V,50-60Hz, Single Phase |
|
1.5kw |
|
2800r/min |
|
0.4~0.6Mpa |
|
50L/min |
|
25~120mm ,max 180mm |
|
120mm |
|
960*900*1500(L*W*H) |
|
|
1pcs | |
|
1set |
|
Several |
|
1set |
|
1pcs |
|
1pcs |
|
|
Mitsubishi ,TCD | |
|
Airtac |
|
Best & Huatong Shandong |
|
Airtac |
|
Schneider |
|
Renmin Shanghai |
|
Chuanglida |
Our engineers have years of experience in upvc & aluminum window making machine fabrication , which make the machines precision and stability more better. After the machine production done, it will be tested in professional way to make sure it performance .Here is showing some detailed pictures for reference .

blades of seamless welding machine are independently developted and processed through hte release process and quenching process .it is using proprietary technology that can be kept level at all times
PLC control machine working
Adopts Mitsubishi ,Japan.
Most famous brand of PLC in PVC window welding machines.


This machine works on welding white upvc profile ,after welding ,need to clean the welding bead with corner cleaning machine.
After cleaning ,there is 3mm width groove is there .
- All the machine packed with standard export wooden case to make sure customer will received the machines they ordered intact.
- All the machines & accessories can be shipped worldwide by sea, by air or by international courier via DHL, FEDEX, UPS.
Packing Detail:
Inner package :stretch film
Outside package : standard export wooden cases


Delivery Detail:
Usually we will arrange dispatch within 3-5 working day after receive payment .
If there are big order or customized machines ,it will take 10-15 working day .
We will according to customer’s requirements (budget,plant area etc ) , to provide the best solution for customers .
All project report and factory layout arrangement are available for valuable customer.

Machine maintenance is necessary ,it will helpful for your machine life , please clean all dusty after use the machine .
7.1 Always check fasteners such as various mechanisms, components, cylinders, etc. to prevent loosening.
7.2 The reference plate and the pressing plate should be kept clean and no upvc profile slags.
7.3 The machine power supply line should be checked every shift; turn off the power and air supply after work.
7.4 The electric control cabinet should be kept clean and dry. Non-professional maintenance personnel should not open the door and circuit.