Copy Router with Triple Drilling Machine for uPVC Profiles
➢ Used for copy-routing processing various kinds of holes, grooves and water-slots and lock hole on aluminium windows and doors.
➢ It has features of compact structure and small volume; the air pressure drives the clamping.
➢ It can achieve continuous copy-routing milling, easy operation and safety.
➢ Using a foot switch control the pressing cylinder, safe and reliable.
Power supply |
380V,50-60Hz, Three Phase |
Input power |
2.25kw |
Spindle rotary speed |
25000r/min |
Air pressure |
0.6~0.8Mpa |
Air comsumption |
30L/min |
Drilling bit diameter |
Φ5mm φ8mm |
Triple drilling bit diameter |
Φ10,Φ12,Φ10mm |
Copy-routing range |
290*100mm |
Overall dimension |
1000*1130*1600(L*W*H) |
Drilling bits |
1pcs |
Triple drilling bits |
1set(three pcs) |
Mobile work pieces supports |
1set |
Air gun |
1pcs |
Complete tooling |
1set |
Certificate |
1pcs |
Operation manual |
1pcs |
Drilling bit |
Weike |
Solenoid valve |
Puteer |
Cylinder |
Best & Huatong Shandong |
Air filter device |
Puteer |
Electric button & knob switch |
Schneider |
AC contactor & MCB |
Renmin Shanghai |

The three drilling bits with a special structure and the motor with vertical / horizontal structure can complete the lock hole machining work at one time.
The finger(STDU) are designed in such a way that the machining range of the machine can be adjusted more conveniently.

All the machine packed with standard export wooden case to make sure customer will received the machines they ordered intact.
All the machines & accessories can be shipped worldwide by sea, by air or by international courier via DHL, FEDEX, UPS.
Packing Detail:
➢ Inner package: stretch film
➢ Outside package: standard export wooden cases

Delivery Detail:
➢ Usually we will arrange dispatch within 3-5 working day after receive payment.
➢ If there are big order or customized machines, it will take 10-15 working day.

We will according to customer's requirements (budget, plant area etc ), to provide the best solution for customers.
All project report and factory layout arrangement are available for valuable customer.

Machine maintenance is necessary, it will helpful for your machine life, please clean all dusty after use the machine.
7.1 For protecting the slip parts, except for clearing the drilling bits on the machine surface frequently, the lubricating oil should be filled in each slip part before and after working.
7.2 The three-hole drill gear case should be filled in the supramoly lubricating grease through oil cup termly (about 3 months).
7.3 Should checkup the drilling bits in the good condition frequently, couldn't use the faulted drilling bits.